
Device Lab Setup & Assembly
Mount customer-supplied devices, route power and USB, configure lab network baseline, run burn-in, and hand off a ready-to-test cluster.
$450 · 2–5 business days
What we build, test, pack, and support — not generic consulting, but hardware handoff from our workshop.
Chassis mount, device trays, PSU routing, and USB cabling in our Guangzhou workshop.
Power, thermal, and connectivity checks before any cluster leaves the factory.
Foam-lined crates and pallet-ready packaging for international freight.
Optional ADB paths, grouping, and workstation configuration after delivery.
From requirement confirmation to remote setup — how we support your deployment.
Confirm requirement — node count, device models, shipping country
Prepare hardware — chassis, PSU, cooling, and cabling sized for deployment
Assemble & test — power, cooling, cabling, and basic operation checks
Pack & ship — export packaging from Guangzhou
Remote setup support — optional ADB and workstation configuration
Mount devices, route power and USB, run burn-in, and hand off a ready-to-test cluster.

Mount customer-supplied devices, route power and USB, configure lab network baseline, run burn-in, and hand off a ready-to-test cluster.
$450 · 2–5 business days

Evaluation kits with 1–2 units, setup guide, and onboarding call — validate build quality before bulk orders.
$699 · 3–5 business days
Configure ADB paths, device grouping, and control workstations for remote lab operation.

Configure ADB paths, device grouping, and a control workstation so QA operators can monitor and command devices in the lab remotely.
$350 · 1–3 business days

Organize devices by project or test suite, configure batch test runs, and integrate with your existing CI or automation scripts.
$500 · 3–5 business days
Bespoke chassis design, rack integration, and enterprise deployment engineering.
Quote RequiredBespoke chassis design, node layout, power and cooling engineering, and rack integration for your device lab requirements.
Custom quote — contact sales · Quote-based
Quote RequiredQuote-based rackmount projects with redundant power planning, network segmentation, remote monitoring baseline, and dedicated project coordination.
Custom quote — contact sales · Quote-based (2–4 weeks)
Large-scale lab provisioning, international shipping, and export logistics.
Quote RequiredQuote-based provisioning for 50+ device labs — bulk APK staging, test environment baseline, fleet health checks, and deployment documentation.
Custom quote — contact sales · Quote-based

Export logistics from Guangzhou — express courier, sea freight, commercial invoice, and tracking handoff.
$150 · Varies by region
Ongoing hardware support, replacement parts, and periodic health checks.

Ongoing hardware maintenance, replacement parts coordination, remote diagnostics, and periodic health checks for production device labs.
$200 · Monthly retainer
Factory sales · Guangzhou, China
Share node count, device models, and shipping country. Our Guangzhou team responds with pricing and configuration guidance within 24 hours.
@huicheng1998 · qiuxui646@gmail.com