PF
PhoneFarm Fun
โ† Back to GuidesSetup & Tutorials ยท 2026-01-20

Phone Farm Setup Guide 2026: From Zero to Production

This guide walks through deploying a PhoneFarm Fun phone farm box from unboxing to first automated task. **Step 1: Unbox and inspect** Verify 20 device slots, power cable, USB cables, and cooling fans. Run visual QC on each node. **Step 2: Power and network** Connect 110V/220V power. Attach network router with dedicated IP per device group if required. **Step 3: USB hub connection** Single USB cable from box to control PC. Install management software and verify all devices appear in dashboard. **Step 4: Device preparation** Enable USB debugging, install required APKs in batch, configure proxy if needed. **Step 5: First automation test** Run a simple script on all 20 devices simultaneously. Monitor temperature and connection stability for 24 hours. Need help? WhatsApp us at +852 6215 5642 for remote setup support.

Talk to Our Sales Team

Factory-direct support from Guangzhou, China. Get pricing, custom quotes, and deployment guidance within 24 hours.

๐Ÿ“ž Call๐Ÿ’ฌ WhatsAppโœˆ๏ธ Telegramโœ‰๏ธ Email